


Here is the first of four beer taps to exit my fridge. I spent some time measuring and spacing out for 4 taps. They will be on 4" centers. So there is an even spread on the door and they won't be too close together. I initially wanted to drill a 7/8 dia hole, but all I could find for under $10 was a 1" hole saw. I could have bought a 7/8 but it would have cost $25 by buying the parts separately, same manufacturer too. Anyways, 1" worked just fine. I sanitized all the parts while I punched the hole. I went with 5' x 3/16" ID tubing. The first pour was a bit foamy. The second was beautiful. So, now I need 3 more shanks, 2 more faucets, and all the other little hardware pieces. I'm stoked on this latest feature to the brew fridge. Now I want a nice bar to stick it in. I guess I will have to move... As far as tap handles, I'm undecided if I'll buy the 6" std round pub handles, or if I'll buy the brass inserts and make my own. The later sounds like a lot of work. I think I'll start with the $3 el cheapo black stubby handles. The first beer to get hooked up is the Belgian Dubble, and thus I will need to brew another belgian beer because that keg will be gone very soon now... I need to brew very soon